NEW SOUTH crews start at sunrise in the Florida Panhandle laying the safest wetland access system to protect electrical utility contractor crews as they upgrade a transmission line that spans over 50 miles.
NEW SOUTH crews start at sunrise in the Florida Panhandle laying the safest wetland access system to protect electrical utility contractor crews as they upgrade a transmission line that spans over 50 miles.